Training Basic Drilling and Completion Operation With Health : (7-9 Mei 2025, Malang) (14-16 Mei 2025, Jakarta) (20-22 Mei 2025, Yogyakarta) (26-28 Mei 2025, Bandung)

Training Basic Drilling and Completion Operation With Health, Safety, Enviromental Consideration

 

TARGET & TUJUAN TRAINING 

Setelah menyelesaikan training ini diharapkan peserta dapat :

PESERTA

Latar belakang  : Operator/Senior Operator/Engineer/Non Engineer

MATERI TRAINING

Introduction : Rotary Drilling Operations
•    Steps to drilling a well
•    Types of rigs
•    Rig Components
•    Rig Systems
Rheology of Drilling and Completion Fluids
•    Equations and Inflow Performance RelationshipFunctions of Drilling/Completion Fluids
•    Fluid Types,
•    Fluid Models
•    Introduction to Rotary Viscometer
•    Other Testing Equipment
•    Objectives of Monitoring Fluids
Mud System
•    General Equations and ConceptsDiagnostic tests
•    Water based muds
•    Oil based muds
•    Additives
•    Mud handling system
Cementing
Tubing DesignFunctions of cement
Cement Types
Cement Additives
Oil Field Tubulars and Hydraulics
•    Drill string
•    Casing and tubing
•    Casing classification
•    Stresses on casing
•    Casing setting depth
•    Burst and collapse calculations
•    Wellheads
Drilling System – Pressure Loss Calculations
•    Hydrostatics
•    Buoyancy
•    Flow through pipes and annuli
•    Flow path
•    Pressure loss calculations
Drilling System – Bit & Nozzles
•    Hydrostatics Bit Types
•    Bit Parts
•    Bit Classification
•    Bit Nozzles
Introduction to Well Control
•    Hydrostatics Definitions
•    Causes of kicks
•    Kick indicators
•    Shut - in procedure
•    Well Kill Procedures
Directional Drilling
•    Reasons for directional wells
•    Planning Trajectory
•    Kickoff Methods
•    Survey Methods
•    Survey Calculations
Penyelesaian sumur (Well Completion)
Tipe - tipe penyelesaian sumur
•    Tipe penyelesaian sumur berdasarkan pemasangan pipa selubung
•    Tipe penyelesaian sumur berdasarkan jumlah zona produksi
Peralatan bawah tanah
•    Pendahuluan
•    Peralatan produksi bawah sumur
Penyelesaian sumur untuk sumur - sumur pengangkatan buatan
•    Sucker Rod Pump (Pompa angguk)
•    Electric Submersible Pump
•    Gas lift
•    Hydraulic Pump
•    Pompa Jet
Kerja ulang sumur (Work Over)
Faktor - faktor penyebab kehilangan produksi
•    Problem Reservoir
•    Problem mekanikal
Perawatan sumur
•    Kerusakan Peralatan
•    Masalah Parafin
•    Pengendapan Scale dan Pengontrolannya
•    Masalah Pasir
•    Kerusakan Formasi
Tipe - tipe Pengerjaan Kerja Ulang Sumur
•    Mengubah Zona Produksi
•    Perangsangan Sumur (Well Stimulation)
•    Squeeze Cementing
Peralatan Kerja Ulang
•    Menara (Rig) Konvensional
•    Unit Wireline
•    Gulungan Tubing Tanpa Sambungan (Endless Tubing Coil)
•    Unit Snubbing
Sand Control Technology
Sand Control Concept
•    Reason for Sand Control
•    Determining Need for Sand Control
•    Selecting Type of Control
•    Proper Drilling and Completion
Gravel and Screen Selection
•   Slot and Gravel Size Design
•    Slotted Liners
•    Screens
•    Prerpacks
Inside Gravel Packing
•    Perforation Packing
•    Two Stages Methods
•    Use of Viscous Carrying Fluid
•    Downhole Equipment
•    Type of Operation
•    Sigle Stage Methods
Open Hole Gravel Packing
•    Conventional Methods
•    Special Tools and Operations
•    Zone Isolation Methods
•    Model Study Result
•    Deviated Well Problem and Solutions
Consolidation
•    Formation Consolidation
•    Consolidation System Features
•    Well Preparation and Design Factor
•    Consolidated  Packs
•    Water Base Systems
•    Thermosetting Gravel Packs
Stable Arc Sand Control
•    The Stable Concept
•    Applying Stress for Sand Control
•    Conventional Cementing Limitations
•    Downhole Equipment
•    Type of Operation
Health, Safety and Environmental Consideration in Drilling Operation
•    Peraturan Perundangan tentang K3L
•    Pengauh Gas Beracun pada Operasi Pemboran
•    Pengaruh  Gas Beracun Bagi Kesehatan
•    H2S
•    Gas Detection Equipments
•    Noise level & exposure in Oil Gas Industry
•    Noise Mapping

TRAINER

Tim Konsultan PT Ganesha Inti Persada

DURASI Training

3 Hari

INVESTASI (Tidak termasuk biaya akomodasi & penginapan)

FASILITAS TRAINING

Sertifikat, Modul pelatihan,Training kit, Lunch, Coffe break, Pelatihan dilaksanakan di hotel berbintang

INFORMASI & PROMO

081296791324 (WA)

021-22830080

CONTACT PERSON

0811-996-1224 (WA)

0812-9679-1324 (WA)

Jadwal Online & OfflineTahun 2025:

Februari

Maret

April

Mei

Juni

Juli

Agustus

September

Oktober

November

Desember

Kami menerima request waktu, tempat & fasilitas hubungi kami untuk informasi lebih lanjut.