LATAR BELAKANG :
- Merupakan salah satu masalah lubang sumur di operasi pemboran
- Menyebabkan timbulnya biaya ekstra yang cukup besar
- Berpotensi menyebabkan hilangnya sebagian atau semua fasilitas pemboran di lapangan karena kick dan blow out yang tidak terkontrol
- Menunda waktu produksi sumur (POP)
SASARAN :
- Mengetahui gejala kejadian kick dan blow out.
- Mengetahui kerugian akibat kick yang tidak terkontrol atau blow out.
- Mengetahui usaha pencegahan terjadinya blow out.
- Mengetahui cara mengidentifikasi mekanisme kick yang terjadi.
- Mengetahui kronologi terjadinya kick dan blow out dan cara penanggulangannya dengan Well Control.
PESERTA TRAINING :
Operator/ Sr. Operator/ Jr. Engineer/Non Engineer
MATERI TRAINING :
Well Control Introduction
- Introduction to course
- Basic Concepts
- Liquid Hydrostatics
Gas Behavior and Hydrostatics
- Ideal Gases
- Effect of Temperature
- Real Gases
- Critical Temperature & Pressure
- Pseudo-Critical Temp. and Press.
- Gas Compressibility
- Gas Migration
Kick and Gas Migration
- Density of real gasses
- Equivalent Mud Weight (EMW)
- Wellbore pressure before and after kick
- Gas migration rate – first order approx.
- Gas migration rate – w/mud compressibility
Gas Solubility
- Solubility of Hydrocarbon Gasses in Oil
- Solubility of Non-Hydrocarbon Gasses in Oil
- Solution Volume Factors
- Oil Mud Recommendations
Pore Pressure Prediction
- Mud Weight and Pore Pressure
- Mud Weight and Fracture Gradient
- Normal Pore Pressure
- ubnormal Pore Pressure
- Abnormal Pore Pressure
- Origins of Pore Pressure
- Bulk Density and Porosity vs. Depth
Drilling Rate and Pore Pressure
- Forces on Subsurface Rock
- d-exponent
- dc-exponent
- Rehm and McClendon
- Zamora
- Comb’s Method
- Bourgoyne and Young’s Method
Other Indicators of Abnormal Pore Pressure
- Moore’s Equation – Drilling rate
- Gas in the Drilling Fluid
- Rock Sample Characteristics
- Use of Surge and Swab Pressure to determine Overbalance
- Changes in Drilling Fluid Properties
- Temperature Indications
- Hole Conditions
Logging While Drilling
- Sonic Travel Time
- Resistivity and Conductivity
- Eaton’s Equations (R, C, Dt, dc)
- Natural Gamma Ray
Fracture Gradients 1
- Allowable Wellbore Pressures
- Rock Mechanics Principles
- Hooke’s Law, Young’s Mudulus, Poisson’s Ratio
- Volumetric Strain, Bulk Modulus, Compressibility
- Triaxial Tests
- Rock Mechanics Principles (con’t.)
- Rock Properties from Sound Speed in Rocks’
- Mohr’s Circle
- Mohr-Coulomb Failure Criteria
Fracture Gradients 2
- Radial and Tangential Stresses near the Wellbore
- Stresses in Rock near Wellbore
- Effect of Anisotropic Stresses
- Onshore vs. Offshore Fracture Gradients
- Fracture Gradients in Inclined Wellbores
- Oil Based and Water Based Drilling Fluids
Fracture Gradients Determination
- Hubbert and Willis
- Matthews and Kelly
- Ben Eaton
- Christman
- Prentice
- Leak-Off Test (experimental)
Kick Detection and Control
- Primary and Secondary Well Control
- What Constitutes a Kick
- Why Kicks Occur
- Kick Detection Methods
- Shut-in Procedures
- Soft and Hard Shut-in
- Water Hammer
Off Bottom Kick
- Slugging of drillpipe
- Hole fill during trips
- Surge and Swab pressures
- Kick detection during trips
- Shut-In Procedures
- Blowout Case History
Control Pressures and Circulation Kill Techniques 1
- Shut-In Pressures
- Weighting Up the Mud
- Driller’s Method
- Wait & Weight Method
Control Pressures and Circulation Kill Techniques 2
- Wait & Weight Method
- Concurrent Method
- Annulus Pressure Profiles
- Kicks in Oil-Based Mud
Secondary Well Control Complications
- Volumetric Well Control
- Lubrication
- Complications During Conventional Kill
- Techniques to Reduce Annular Friction
Special Well Control Applications
- Underbalanced Drilling
- Well Control in Unconventional Hole Programs
- Casing and Cementing Operations
Equipments
- High Pressure Equipment
- Control System Equipment and Design
- BOP Inspection and Test Considerations
- Low-Pressure Equipment
- Equipment Arrangement: Design and Philosophy
- Casing
- Casing Heads and Spools
- Stack Equipment
- Choke and Kill Line Equipment
- Drillstem Control Equipment
Offshore Operations
- Equipment Used in Floating Drilling
- Operational Considerations in Floating Well Control
- Shallow Gas Hazards
- Trends in Deepwater Drilling
TRAINER
PT. Ganesha Inti Persada consultant team
DURATION OF TRAINING
3days (effective21thhours )
INVESTMENT TRAINING (Excluding Accommodation) :
- IDR 10.700.000,-/participant (Jakarta)
- IDR 11.000.000-/participant (Bandung)
- IDR 12.000.000,-/participant (Yogyakarta)
- IDR 14.000.000,-/participant (Bali)
- IDR 14.750.000,-/participant (Lombok)
- USD 4778/participant (Malaysia)
TRAINING FACILITIES
Certificate, Module, Training Kit, Lunch, Coffee Break, held in hotel
INFORMATIONAND PROMO
081296791324 (WA)
021-22830080
CONTACT PERSON
0811-996-1224 (WA)
0812-9679-1324 (WA)
TRAINING METHOD
Interactive Methods, Presentations, Discussions
JADWAL TRAINING TAHUN 2024 :
November
- 13-15 November 2024, Bali
- 20-22 November 2024, Surabaya
- 27-29 November 2024, Yogyakarta
Desember
- 4-6 Desember 2024, Bandung
- 11-13 Desember 2024, Medan/ Jakarta
- 18-20 Desember 2024, Makassar/ Yogyakarta
Jadwal Online & OfflineTahun 2025:
Januari
- 2-4 Januari 2025, Lombok
- 7-9 Januari 2025, Jakarta
- 15-17 Januari 2025, Yogyakarta
- 20-22 Januari 2025, Bandung
Februari
- 5-7 Januari 2025, Batam
- 12-14 Januari 2025, Jakarta
- 19-21 Januari 2025, Yogyakarta
- 2628 Januari 2025, Bandung
Maret
- 5-7 Maret 2025, Malang
- 12-14 Maret 2025, Jakarta
- 19-21 Maret 2025, Yogyakarta
- 26-28 Maret 2025, Bandung
April
- 2-4 April 2025, Surabaya
- 9-11 April 2025, Jakarta
- 15-17 April 2025, Yogyakarta
- 23-25 April 2025, Bandung
Mei
- 7-9 Mei 2025, Malang
- 14-16 Mei 2025, Jakarta
- 20-223 Mei 2025, Yogyakarta
- 26-28 Mei 2025, Bandung
Juni
- 2-4 Juni 2025, Bali
- 9-11 Juni 2025, Jakarta
- 16-18 Juni 2025, Yogyakarta
- 23-25 Juni 2025, Bandung
Juli
- 1-3 Juli 2025, Batam
- 7-9 Juli 2025, Jakarta
- 14-16 Juli 2025, Lombok
- 21-23 Juli 2025, Yogyakarta
- 28-30 Juli 2025, Bandung
Agustus
- 4-6 Agustus 2025, Bali
- 11-13 Agustus 2025, Jakarta
- 18-20 Agustus 2025, Yogyakarta
- 25-27 Agustus 2025, Bandung
September
- 2-4 September 2025, Surabaya
- 8-10 September 2025, Jakarta
- 15-17 September 2025, Yogyakarta
- 24-26 September 2025, Bandung
Oktober
- 2-4 Oktober 2025, Bali
- 6-8 Oktober 2025, Jakarta
- 13-15 Oktober 2025, Yogyakarta
- 20-22 Oktober 2025, Semarang
- 27-29 Oktober 2025,Bandung
November
- 5-7 November 2025, Lombok
- 12-14 November 2025, Jakarta
- 19-21 November 2025, Yogyakarta
- 26-28 November 2025, Bandung
Desember
- 1-3 Desember 2025, Surabaya
- 8-10 Desember 2025, Jakarta
- 15-17 Desember 2025, Yogyakarta
- 29-31 Desember 2025, Bandung
Klik link form registrasi https://bit.ly/FormRegistrasiPTGIP
Kami menerima request waktu, tempat & fasilitas hubungi kami untuk informasi lebih lanjut.